A heat treatment furnace takes a casting from its as-cast state to the properties the drawing asks for: normalizing or quench and temper for steel, ferritizing or stress relief for ductile iron, T6 for aluminium. Three things decide which furnace you need: the heaviest part, the highest process temperature, and whether the load has to be quenched. Most jobbing foundries with heavy, mixed work start with a bogie hearth furnace.
Which casting needs which treatment
- Carbon and low-alloy steel — Treatment: Normalizing; Typical temperature: 880–950 °C; Cooling: Still air
- Carbon and low-alloy steel — Treatment: Quench and temper; Typical temperature: 850–920 °C, temper 550–680 °C; Cooling: Water or polymer, then air
- Manganese steel (Hadfield) — Treatment: Solution anneal; Typical temperature: 1,050–1,100 °C; Cooling: Fast water quench
- Stainless steel — Treatment: Solution anneal; Typical temperature: 1,040–1,120 °C; Cooling: Water
- Ductile iron — Treatment: Ferritizing anneal; Typical temperature: 880–920 °C, then hold around 700 °C; Cooling: Slow, in furnace
- Grey and ductile iron — Treatment: Stress relief; Typical temperature: 500–600 °C; Cooling: Slow, in furnace
- Aluminium (A356 etc.) — Treatment: T6: solution + ageing; Typical temperature: 530–540 °C, age 150–170 °C; Cooling: Water, within seconds
These are typical ranges. Your customer's material spec sets the real numbers, so size the furnace for the hardest cycle in the spec, not the average one.
Furnace types
Bogie hearth furnace: the hearth is a car that rolls out on rails. Castings are loaded by crane, the car rolls in, the door drops. Loads run from about 1 t to well over 50 t. It is the standard furnace in a steel foundry. Its weak point is quenching: getting the car out and the parts into the tank takes time, and with manganese steel that delay matters.
Box (chamber) furnace: front door, loaded by forklift, a few hundred kilos to a few tonnes per load. Good for short runs and many part numbers.
Pit furnace: long castings such as shafts and pipes hang vertically, which keeps distortion down.
Drop-bottom quench furnace: the aluminium T6 furnace. The basket drops straight into a water tank under the furnace in a few seconds. A separate low-temperature ageing oven sits next to it.
Continuous furnaces (roller hearth, mesh belt, pusher): for high-volume, single-family production such as automotive parts. High capital cost, and poor value if your part mix is wide.
Tempering furnace: a fan-circulated furnace running below 700 °C after quenching. Usually bought separately so the main furnace is not tied up.
Capacity, cycle time and energy
The load is castings plus fixtures and baskets. Fixtures can add 20–40% to the part weight, and they are the first thing people forget when sizing.
A cycle is heat-up, soak and cool-down. The shop-floor rule for soak is roughly one hour per 25 mm of section. A normalizing cycle in a bogie hearth furnace typically takes 10–20 hours, which means one load a day. If that is not enough, a two-car layout lets you unload and reload one car while the other is in the furnace.
Heating steel to 900 °C takes about 170 kWh per tonne in theory. With furnace losses, an electric bogie hearth furnace typically uses 300–500 kWh per tonne. Ceramic fibre lining and full loads pull that figure down; half-empty loads push it up.
Temperature uniformity of about ±10 °C is normal for general castings. Defence, aerospace or pressure-equipment customers may ask for ±5 °C and a standard such as AMS 2750, which brings more thermocouples, a recorder and regular temperature uniformity surveys (TUS).
Gas or electric? Natural gas is cheaper per kWh in most of the region, and the gap grows with furnace size. Electric furnaces are easier to control and need less maintenance. Where the grid is unreliable, gas is the safer choice.
What to decide before you ask for quotes
- Heaviest part and largest dimensions, measured against usable volume, not the inside dimensions of the lining.
- Monthly tonnage and cycle time, which set the number of furnaces and cars.
- Highest process temperature. Above 1,100 °C the lining and heating elements change.
- Quenching: tank volume, agitation, cooling tower and transfer time.
- Records: number of thermocouples, recorder, TUS reports.
- Utilities: transformer capacity or gas flow.
- Atmosphere. Air is fine for most castings. If scale is not acceptable you need a protective atmosphere or vacuum, which is a different budget.
Checklist for a used heat treatment furnace
- Lining: sagging or separated fibre modules, spalled brick. If possible, fire the furnace and scan the shell with a thermal camera; hot spots mean lining loss.
- Heating elements or burners, and whether spares are still available.
- Door seal and lifting mechanism.
- Car: wheels, rails, hearth refractory, sand or water seal.
- Controls: panel, thermocouples, recorder, PLC program and passwords.
- Paperwork: last TUS report and maintenance records.
- Dismantling: a bogie hearth furnace is moved in sections and may need relining on site. Put that cost in the comparison.
- Scope: are the quench tank, pumps and cooling tower included?
FAQ
Do all castings need heat treatment? Grey iron often does not. As-cast steel is coarse-grained and stressed, so normalizing is almost always required. For ductile iron and aluminium the spec decides.
How do I size a bogie hearth furnace? The heaviest single load plus fixtures has to fit on the car. Divide monthly tonnage by load weight and by the number of cycles you can run per month to get the number of furnaces or cars.
Do I need a separate tempering furnace? You can temper in the same furnace, but the main furnace sits idle meanwhile. In a quench and temper shop a separate tempering furnace nearly doubles throughput.
Is a used furnace worth it? If the steel casing and car are sound, a used furnace with new lining and controls still costs well below a new one. A furnace with a distorted steel structure is not worth buying.
Related listings and guides
There is no heat treatment furnace in the used list at the moment. New furnace: Kehua bogie hearth heat treatment furnace. Related guides: Machines needed to set up a foundry, Quality requirements in foundry projects, Foundry relocation, Tumble blast machines (for descaling after heat treatment).
How ZENES helps
We size new heat treatment furnaces from your part list and monthly tonnage and put quotes from different makers side by side on the same scope. For used furnaces we inspect on site, dismantle, ship and reinstall. Send the size of your heaviest casting, the material and the monthly tonnage, and we will work out the furnace size and cycle plan.